Our Projects

Completed :: Feasibility

RASP Zinc Project

Client Location Period Description
CBH Resources Ltd Broken Hill, NSW 2006 to 2010 The project includes a 750,000 tpa processing facility and associated
infrastructure to produce separate lead and zinc concentrates
Read more...
 

Kanmantoo Copper Project

Client Location Period Description
Hillgrove Resources Ltd Adelaide, SA 2008 AEL carried out the Project Definition Stage (PDS) for a 2Mtpa copper project. The PDS was a follow-on from the Bankable Feasibility Study, where AEL optimised the process plant design and capital cost prior to the full project Implementation stage.
Read more...
 

Prairie Downs Lead/Zinc Project

Client Location Period Description
Prairie Downs Metals Newman, WA 2008 AEL carried out the Bankable Feasibility Study for a 500,000 tpa processing facility and associated infrastructure
Read more...
 

Phillips River Gold Project

Client Location Period Description
Tectonic Resources Ravensthorpe, WA 2006 The project included the processing facility and associated infrastructure, to treat 500,000 tpa of oxide ore and 300,000 tpa of sulphide ore.
Read more...
 

Syama Oxide Gold Project

Client Location Period Description
Resolute Mining Bamako, Mali 2009 AEL were commissioned to complete a feasibility study for an oxide circuit to treat 1.5Mtpa in parallel with the existing sulphide ore circuit.
Read more...