Our Projects
Completed :: Feasibility
RASP Zinc Project
| Client | Location | Period | Description |
|---|---|---|---|
| CBH Resources Ltd | Broken Hill, NSW | 2006 to 2010 |
The project includes a 750,000 tpa processing facility and associated infrastructure to produce separate lead and zinc concentrates |
Kanmantoo Copper Project
| Client | Location | Period | Description |
|---|---|---|---|
| Hillgrove Resources Ltd | Adelaide, SA | 2008 | AEL carried out the Project Definition Stage (PDS) for a 2Mtpa copper project. The PDS was a follow-on from the Bankable Feasibility Study, where AEL optimised the process plant design and capital cost prior to the full project Implementation stage. |
Prairie Downs Lead/Zinc Project
| Client | Location | Period | Description |
|---|---|---|---|
| Prairie Downs Metals | Newman, WA | 2008 | AEL carried out the Bankable Feasibility Study for a 500,000 tpa processing facility and associated infrastructure |
Phillips River Gold Project
| Client | Location | Period | Description |
|---|---|---|---|
| Tectonic Resources | Ravensthorpe, WA | 2006 | The project included the processing facility and associated infrastructure, to treat 500,000 tpa of oxide ore and 300,000 tpa of sulphide ore. |
Syama Oxide Gold Project
| Client | Location | Period | Description |
|---|---|---|---|
| Resolute Mining | Bamako, Mali | 2009 | AEL were commissioned to complete a feasibility study for an oxide circuit to treat 1.5Mtpa in parallel with the existing sulphide ore circuit. |