Client Location Period Description
Tectonic Resources Ravensthorpe, WA 2006 The project included the processing facility and associated infrastructure, to treat 500,000 tpa of oxide ore and 300,000 tpa of sulphide ore.

OVERVIEW

The project is located near the Town of Ravensthorpe in Western Australia.

The Bankable Feasibility Study was completed in 2006. The project included the processing facility and associated infrastructure, to treat 500,000 tpa of oxide ore and 300,000 tpa of sulphide ore.

The processing route incorporated two stage crushing, Ball Milling, gravity separation, pre-flotation (high copper ores), CIL circuit, elution and gold recovery.