Kanmantoo Copper Project, SA

 

Client Location Value Period Description
Hillgrove Resources Callington, SA $57M September 2010 to November 2011 Concentrator and associated infrastructure design and construction (EPC Contract)

OVERVIEW

Located near the town of Callington, approximately 60km South East of Adelaide in South Australia.

Design and Construct Contract.

AEL identified the ex Pillara Process Plant as suitable for utilisation at Kanmantoo.

Project involved the dismantle and relocation of the Pillara Lead/Zinc plant near Fitzroy Crossing in WA to Kanmantoo near Adelaide in SA. The plant will treat copper/gold ores at Kanmantoo with relatively minor modifications and enhancements.

Cimeco carried out the dismantle works at Pillara, and the installation works at Kanmantoo under AEL management.