| Client | Location | Value | Period | Description |
|---|---|---|---|---|
| Simcoa Operations | Bunbury, WA | $110M | December 2009 to August 2011 | Furnace No.3 Expansion, Engineering, Procurement and Construction Management (EPCM Contract) |
OVERVIEW
Project located at Simcoa’s Silicon Production Facility in the Kemerton Industrial Park, approximately 20km north of Bunbury in WA.
AEL are providing the EPCM services for the project which involves the installation of a third submerged arc furnace and associated infrastructure.
The engineering design was completed in 3-D, with a fully integrated “intelligent” 3-D model produced as part of the design process.